Monday, August 8, 2016

Week 12: Floors, Appliances, Touch-Up Work

Week 12 - August 1 - 7, 2016

 

Days 78 - 84


  • Hardwood floors & carpets installed - 8/1-8/3
  • Appliances arrive - 8/4
  • Drywall spackling/ touch ups (everything is pink!)
  • Sprayed inside of main vents black (instead of shiny)
  • Bathroom fixtures hung (TP holders, towel racks, etc.)
  • Shower surround in master bath installed
  • Shower curtain rods hung in hall & guest bath
  • Faucets installed everywhere.


We asked our PM for a walk-through on Wednesday afternoon. It was GREAT to see the progress, and our floors in particular. I love them!! Wish we could have seen the appliances, but we were a day too early. We measured for blinds and took a few pics (see below).
Work definitely feels slower now that it's detail stuff and not drastic changes.
We caught a few new fixes:
  • Cable outlet was faced into the loft, when it should have faced into bedroom #3.
  • Long towel bar hung in powder room (had requested it be left off). I don't understand why they install a full towel bar in a powder room. It should be a ring or short bar. So silly.
  • Move TP holder in master WC from next to toilet to on opposite wall.
  • Carpet transitions between rooms obvious in a couple of places - you can see the cuts.
  • Front living room window is being bowed up pretty severely by mortar globs on the stone.
And a few remain that PM added to/kept on his list:
  • Banged up kitchen cabinets
  • Still wrong vanities in hall and guest baths
  • Door swings of laundry room and master bath need to be reversed
  • Crooked ceiling drywall in pantry hallway (between kitchen & dining room)
  • Horrendous drywall gap and blobs of spackle around front door light switch
  • bowed drywall above loft windows
  • white outlet cover on espresso island
Some general stuff I don't love, but can't do anything about:
  • Front door has no trim, and a plain white kickplate. Snore.
  • Strange undersized garage carriage lights
  • We paid for upgraded padding in study. It does not feel upgraded in the least.
  • Ugly/cheap-looking window in front door
  • Meh about the stone selection


One happy note: PM demonstrated that electrician was able to accommodate my wiring request to control front porch and garage lights from the same place inside the front door. Yay PM!


Day 8: Dining Room and floors! Note the raised box molding to accommodate higher baseboards we'll install ourselves. Resolution to that ugly issue!

Day 80: Entry View with bonus shots of hubs and PM + So.many.boob lights.

Master Bath light fixture - not a big fan

Day 80: Master shower. BIG fan!

Day 80: The Glorious Tub!

Day 80: Study with "upgraded" carpet and pad


Tuesday, July 26, 2016

Week 10: Tile, Granite, Lighting Fixtures, Driveway, Grading


Week 10 - July 18 - July 24, 2016

 

Days 64 - 70
  • Received closing date of 8/29! 
  • Tile
  • Granite
  • Vinyl flooring
  • lighting fixtures
  • driveway
  • grading
  • Visited on 7/24 to see progress

So, now that we're 45 minutes away, it's getting harder to swing by the house to check things out. I have no idea what happened which day, but a fair amount was finished this week.


#1 The bathrooms are tiled (floor & shower in master, showers only in guest & hall baths). I'm loving how the master bath looks. We picked a pretty high level upgrade (mostly because I didn't love anything else), and I'm feeling like it was worth it. The only disappointment was that because they tile after the baseboards are installed, the baseboards now appear really short. I get why Ryan organizes their sub schedule like they do, but I really think flooring BEFORE trim, (which would do away with the need for quarter-round), and is the CORRECT order of construction would be smart, and look so much better.


#2 The hall and guest bathrooms + laundry room had their vinyl floors installed. I don't hate them, and actually bent down to make sure they were vinyl because they looked like tile at first!


#3 Power was turned on and light fixtures were installed! I definitely don't love the dining room chandelier or the infamous "boob" lights in the front entry hallway, but they're not horrible. Not 100% sold on the master bath lighting fixture over the vanity in oil-rubbed bronze. I hadn't realized the glass itself would be a beigey/brown streak look rather than white or clear. Not the biggest fan, but it's not horrible, and hopefully we can change those out. I like the black garage door and porch lamps, but they all seem undersized somehow?  Hubs hates having the porch lamp at all, and thinks the 2 lights in the overhang will be more than enough light. Still to be seen, I guess.


#4 Grading is coming along, although I don't think it's quite finished yet. Blacktop driveway was poured.


All-in-all, not as much progress as I expected? Everything seemed to slow down a little bit after last week's massive progress.


Open issues our PM is working on -
1. ordering new, 36" cabinet with fridge side panels + filler to replace the 1-paneled 39" cabinet currently installed.
2. Replacing the incorrect vanities in the hall and guest bath with Fairfield Wheat. We're told they're already on order.
3. Correcting the (special request) door swings of the master bath into the bedroom and the laundry room into the loft.
4. Not sure if he knows this yet, but we saw that the quarter-round had been delivered in a really dark espresso. Two problems with that: they don't match our floor color (too dark). We paid extra to have white quarter round to match the baseboards rather than the floor. So definitely not correct either way. LOL


Last thought: Closing is scheduled! Our final walk through has been booked with our PM for August 22 for quite a while.  Last week we got the confirmed closing date of August 29! (We asked for 8/26, but were rejected). 8/29 is a Monday, which leaves us 8/30 and 8/31 for us to move in before we go away Labor Day weekend. Shouldn't be too crazy at all, right? (sarcasm).






Pics!


Day 67:  Exterior Lights installed. Why does the garage lamp look so undersized?

Day 70: Basement - Finished portion

Day 70: Bedroom 2

Day 70: Dining Room

Day 70: Family Room with study door to the back right


Day 70: Vinyl floor in hall bath (notice WRONG cabinet and now that I look closely, the vinyl doesn't look so good/even running to the baseboard on the right. Anyone else see the gap?)

Day 70: Granite! Bonus pic of Munchie & Me.

Day 70: Kitchen with wrong cabinets over and around fridge cutout


Day 70: First - Tilt your head completely to the right.
This crappy pic is a sideways view of master shower and wrong door swing. Isn't the tile gorgeous? It looks like a hotel, and I'm in love. Still annoyed about the plastic shower pan.