Week 12 - August 1 - 7, 2016
Days 78 - 84
- Hardwood floors & carpets installed - 8/1-8/3
- Appliances arrive - 8/4
- Drywall spackling/ touch ups (everything is pink!)
- Sprayed inside of main vents black (instead of shiny)
- Bathroom fixtures hung (TP holders, towel racks, etc.)
- Shower surround in master bath installed
- Shower curtain rods hung in hall & guest bath
- Faucets installed everywhere.
We asked our PM for a walk-through on Wednesday afternoon. It was GREAT to see the progress, and our floors in particular. I love them!! Wish we could have seen the appliances, but we were a day too early. We measured for blinds and took a few pics (see below).
Work definitely feels slower now that it's detail stuff and not drastic changes.
We caught a few new fixes:
- Cable outlet was faced into the loft, when it should have faced into bedroom #3.
- Long towel bar hung in powder room (had requested it be left off). I don't understand why they install a full towel bar in a powder room. It should be a ring or short bar. So silly.
- Move TP holder in master WC from next to toilet to on opposite wall.
- Carpet transitions between rooms obvious in a couple of places - you can see the cuts.
- Front living room window is being bowed up pretty severely by mortar globs on the stone.
And a few remain that PM added to/kept on his list:
- Banged up kitchen cabinets
- Still wrong vanities in hall and guest baths
- Door swings of laundry room and master bath need to be reversed
- Crooked ceiling drywall in pantry hallway (between kitchen & dining room)
- Horrendous drywall gap and blobs of spackle around front door light switch
- bowed drywall above loft windows
- white outlet cover on espresso island
Some general stuff I don't love, but can't do anything about:
- Front door has no trim, and a plain white kickplate. Snore.
- Strange undersized garage carriage lights
- We paid for upgraded padding in study. It does not feel upgraded in the least.
- Ugly/cheap-looking window in front door
- Meh about the stone selection
One happy note: PM demonstrated that electrician was able to accommodate my wiring request to control front porch and garage lights from the same place inside the front door. Yay PM!
 |
Day 8: Dining Room and floors! Note the raised box molding to accommodate higher baseboards we'll install ourselves. Resolution to that ugly issue! |
 |
Day 80: Entry View with bonus shots of hubs and PM + So.many.boob lights. |
 |
Master Bath light fixture - not a big fan |
 |
Day 80: Master shower. BIG fan! |
 |
Day 80: The Glorious Tub! |
 |
Day 80: Study with "upgraded" carpet and pad |